Power Factor Site Evaluation

Wasted energy capacity, also known as poor power factor, is often overlooked. Typical power factor levels even in new commercial and industrial facilities can range from 65 to 90 percent resulting, in many cases, in additional utility charges.

By filling out this form Eaton will review applicable utility information, existing electrical metering data, and any other relevant information that you can provide to determine if power factor correction is economically feasible for your facility. If your facility can benefit from an Eaton power factor correction solution our FREE site evaluation of your facility (continental United States only) will determine the capacitance required to optimize your power factor level along with site installation requirements so that you can then make sound decision, with the financial justification, to help you decide if this approach is appropriate.

Need to speak to a power factor or harmonic filtering expert right away? Please call our Technical Resource Center at 1-800-809-2772, option 4, sub-option 2 to speak to an Eaton Application Engineer. We can also be reached via e-mail at pfc@eaton.com.